0 ratings
Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with 1/4" Aluminum Universal Quick Coupler and Plug, 300 PSI Maximum Pressure, Red

Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with 1/4" Aluminum Universal Quick Coupler and Plug, 300 PSI Maximum

0 ratings Write a review
Out of stock
us Imported from USA store
Our Top Logistics Partners
  • fedex
  • dhl
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Down Voltage Transformer required for using electronics products of US store (110-120). Recommended power converters Buy Now.

Product Details

Shop Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with 1/4 Aluminum Universal Quick Coupler and Plug, 300 PSI Maximum Pressure, Red online at a best price in Malta. B0F24G2MK5
Item Weight1.5 lbs (680 grams)

Product Description

Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in Short Air Compressor Hose with 1/4" Aluminum Universal Quick Coupler and Plug, 300 PSI Maximum Pressure, Red

Customer Questions & Answers

  • Question: How to Shop Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in Online From Ubuy?

    Answer: It’s easy to shop Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in Available to Shop Online in Malta?

    Answer: Yes, at Ubuy Malta this product is available for you to shop at a reasonable price. The Hybrid Air Hose, 1/4 Inch ID By 10 Feet Long Lead-in is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.